Placement & Installation

PLACEMENT

If the delivery time of the bathroom pods and the construction schedule of the building have been synchronized properly, the easiest way of installation is so called "vertical installation". The units are placed by crane directly into their final position after each floor level has been finished. Otherwise the "horizontal installation" can be applied. A special craning cradle, or a loading platform is used for the horizontal installation, bringing the pod to the desired floor.

INSTALLATION

The units are then relocated to their final position using the wheels, provided by the manufacturer. No other handling equipment is required on site. Each pod has its own individual MEP system already installed and concentrated into one point, allowing easy and quick connection to the main shafts.

HORIZONTAL PLACEMENT – LOADING PLATFORM

HORIZONTAL PLACEMENT – CRADLE

VERTICAL PLACEMENT -
TIME ARRANGEMENT

Latest News
  • OCCA Off-site will participate at the Ecobuild 2015 Exhibition in London. We will be pleased to welcome you at our stand S4016 between the 3rd and 5th of March 2015! eco build
Contact Us
  • Address: : Yıldız Posta Caddesi, Yıldız Residence No:24/8
    34349 Gayrettepe
    Beşiktaş, Istanbul, Turkey
  • Phone:+90 212 325 40 15-17
  • Email: info@occaoffsite.com
  • Monday - Friday: 08:30 - 18:00
    Saturday - Sunday: Closed
DOWNLOAD BROCHURE
  • General Brochure: OCCA BP Brochure
© 2014. OCCA All rights reserved.